NEW QUESTION 13
Which two Management Reporting data sources can be used for a chart?

  • A. an existing grid in the same report
  • B. an existing grid in another report
  • C. another valid Management Reporting data source connection
  • D. Smart view data grid
  • E. another report

Answer: D,E

 

NEW QUESTION 14
In the sign off phase, which two can the report signers can do to the Final Report?

  • A. Approve the Final Report
  • B. Unlock the Final Report and make Changes
  • C. Reject the Final Report
  • D. Sign off the Final Report

Answer: C,D

Explanation:
https://docs.oracle.com/cloud/latest/eprcs_common/URPRV/signing_off_on_or_rejecting_a_report_140476.htm#URPRV-GUID-95E6CF1D-7D6B-409C-ABB1-AE3F913AC5BB

 

NEW QUESTION 15
Which step is NOT performed during the process of generating an XBRL Instance Document?

  • A. Rearrange Doclets up or down with arrow key.
  • B. Review and modify any mappings.
  • C. Validate Master document.
  • D. Validate individual doclets.
  • E. Generate and export the instance document for filing.

Answer: C

 

NEW QUESTION 16
When adding available content from a management report reference doclet, which two object types are available?

  • A. Chart
  • B. Grid
  • C. Text
  • D. Image

Answer: A,B

Explanation:
https://docs.oracle.com/cloud/latest/eprcs_common/DMEPR/DMEPR.pdf

 

NEW QUESTION 17
Which three are ways to resolve Duplicate tagging of taxonomies in Disclosure Management?

  • A. Validate dimensions are tagged in a network table to avoid the same data points for a concept in multiple columns.
  • B. Validate duplicate issues by publishing, the entire workbook, not just a worksheet.
  • C. Validate that a concept present in multiple tables has Totals that represent a concept tagged.
  • D. Validate the basic XBRL in Arelle after publishing the XBRL Instantance.

Answer: D

Explanation:
https://docs.oracle.com/cloud/latest/eprcs_common/UDEPR/general_faqs_222x8e51bd46.htm#UDEPR-GUID-3A54B10E-54E1-4EFC-B1F9-096A86DA1185

 

NEW QUESTION 18
Which statement about the set up of Disclosure Management security is NOT true?

  • A. Permissions available for Disclosure Management include View and Administrator
  • B. It defines permissions for Disclosure Management artifacts from the EPRCS web client.
  • C. It grants access to master documents and doclets by using Access Control Lists (ACLs).
  • D. It grants access to master documents and doclets using Explorer in the Disclosure Management Smart View extension.

Answer: D

 

NEW QUESTION 19
Which two statements are TRUE about the Review Process in Enterprise Performance Reporting Cloud Service?

  • A. It can have multiple Reviewers per Report Packages.
  • B. It can have multiple Review Phases per Report Package.
  • C. It can have multiple Review Cycles per Report Package.
  • D. It can have multiple simultaneous Review Instances per Report Package.

Answer: A,B

 

NEW QUESTION 20
How can you store procedures or instructions within a Package?

  • A. Notes Section
  • B. User Instructions
  • C. Review
  • D. Review
  • E. Supplemental

Answer: E

 

NEW QUESTION 21
During the author phase, what are the two ways to reset the workflow on a doclet?

  • A. Once a doclet is submitted, you cannot change the status.
  • B. Reject the doclet.
  • C. Delete the doclet from the Report Package.
  • D. Restart the doclet.

Answer: D

Explanation:
https://docs.oracle.com/cloud/latest/eprcs_common/MRPRO/managing_the_author_phase_144971.htm#MRPRO-GUID-1FC20A0D-7A84-41E3-B9DF-27577755A558

 

NEW QUESTION 22
You need to add the number 10 to column A in a management report. Which two are acceptable formula syntaxes for doing this?

  • A. SUM([A],10)
  • B. SUM(A, 10)
  • C. A+10
  • D. =SUM(A, 10)
  • E. =SUM([A],10)
  • F. [A]+10

Answer: D,E

 

NEW QUESTION 23
Which is FALSE about managing the Sign Off Phase?

  • A. After a Sign Off Instance is created, no edits can be made to the Report Package content.
  • B. If you determine that no changes are necessary as a result of a Signer's Rejection, you can resend the Sign Off request without unlocking (he report package.
  • C. When the Sign Off Request action takes place on a Report Package the report package status is Changed to "Sign Off In Progress."
  • D. You cancel the Sign Off and reopen the Report Package for more editing.

Answer: A

 

NEW QUESTION 24
When adding data defined in an excel reference doclet, how do you embed into a word doclet?

  • A. From the Report center, click Add data.
  • B. Front Report center, select Update Doclet Definition.
  • C. in Word, from the Performance Reporting Menu, click Embed.
  • D. In Word, from the Smart View menu, click Import Data.
  • E. In Word, from the Smart View Menu, Add Function.

Answer: D

 

NEW QUESTION 25
You just set up an application, and now you must assign security. The client informs you that they do not need to restrict access on a granular level.
Which data level approach should you take?

  • A. Security is only set on a granular level, so there is no need to assign access.
  • B. You can grant access to users on the entire application.
  • C. You can use a data grant and specify the portions of data within the model that can be accessed by users, groups or users and groups.
  • D. You can grant access to users on ยป dimension by dimension basis.

Answer: D

Explanation:
https://docs.oracle.com/cloud/latest/eprcs_common/ADEPR/ADEPR.pdf

 

NEW QUESTION 26
You want to add a logo to your Doclets, where would you make this update?

  • A. Design Phase
  • B. Report Package
  • C. Style Sample
  • D. Author Phase
  • E. Format Grid

Answer: B

 

NEW QUESTION 27
Which use case is suited for the EPM Integrated Business Processes feature?

  • A. Adding a link to an Enterprise Performance Reporting Cloud (EPRCS) report from an Enterprise Planning & Budgeting Cloud (EPBCS) nuvlg.it ion flow
  • B. Adding a link to a Disclosure Management report from Hyperion financial Management
  • C. Adding a link to an on-premise Hyperion Planning report from a report package
  • D. Adding a link to an Enterprise Performance Reporting Cloud (EPRCS) report package from an Oracle

Answer: D

Explanation:
Analytics Cloud (OAC) dashboard

 

NEW QUESTION 28
......


Oracle 1z0-1083-22 Exam Syllabus Topics:

TopicDetails
Topic 1
  • Describe development phases, roles of users and actions that can be performed
  • Describe performing collaborative and iterative reviews
Topic 2
  • Describe report package and its components
  • Narrative Reporting Overview
  • Working with Management Reporting
Topic 3
  • Describe the Narrative Reporting library and what actions can be performed
  • Customize setting up appearance and uploading additional fonts
Topic 4
  • Create PDF-based report package structure
  • Set up Narrative Reporting security
Topic 5
  • Perform lifecycle management for different scenarios
  • Execute File Transfer Utility commands
Topic 6
  • Explain audits supported in Narrative Reporting - service administrators and users
  • Describe the Report Package development and management lifecycle
Topic 7
  • Build content adding doclets and supplemental doclets
  • Identify report package design considerations
Topic 8
  • Describe management reporting and key differentiating benefits
  • Setting up and Managing Narrative Reporting Environment

 

1z0-1083-22 Premium Files Practice Valid Exam Dumps Question: https://www.pass4surequiz.com/1z0-1083-22-exam-quiz.html

Practice with 1z0-1083-22 Dumps for Oracle Enterprise Performance Reporting Cloud Service Certified Exam Questions & Answer: https://drive.google.com/open?id=1JAYXytr3JxXeOO9ujEArjOpr7xhFL2Tp