NEW QUESTION # 11
Select six of the activities that are specifically required by ISO 17021-1 as part third-party (Certification Body) surveillance audit processes.

  • A. Verify legal compliance.
  • B. Review the calibration status of the instrumentation.
  • C. Handling of customer complaints since last visit.
  • D. Conduct a minimum number of annual surveillance audits during the certification period.
  • E. Review the status of previously raised findings and audit effectiveness of any outstanding findings.
  • F. Audit use of certification marks on marketing materials.
  • G. Review changes to the QMS since last visit.
  • H. Confirm effectiveness of internal audit and management review.
  • I. Failing to meet financial responsibilities.
  • J. Complete a full document review of the quality management system.

Answer: A,C,E,F,G,H

Explanation:
The activities that are specifically required by ISO 17021-1 as part of third-party (Certification Body) surveillance audit processes are:
*Option A: Audit use of certification marks on marketing materials. This option is correct because ISO
17021-1:2015 clause 9.6.2.2 requires the certification body to audit the client's use of marks and/or any other reference to certification, as applicable, to ensure conformity with the certification requirements.
*Option B: Review changes to the QMS since last visit. This option is correct because ISO 17021-1:2015 clause 9.6.2.2 requires the certification body to review any changes affecting the client's quality management system and its ability to continue to fulfil the requirements of the standard used for certification.
*Option C: Confirm effectiveness of internal audit and management review. This option is correct because ISO
17021-1:2015 clause 9.6.2.2 requires the certification body to confirm the continuing effectiveness of the client's quality management system, including the effectiveness of the internal audit and management review processes.
*Option F: Review the status of previously raised findings and audit effectiveness of any outstanding findings.
This option is correct because ISO 17021-1:2015 clause 9.6.2.2 requires the certification body to review the status of findings and any corrective actions taken by the client in response to previous audits, and to verify the effectiveness of the implemented corrective actions.
*Option H: Verify legal compliance. This option is correct because ISO 17021-1:2015 clause 9.6.2.2 requires the certification body to verify the client's compliance with applicable statutory and regulatory requirements related to the scope of certification.
*Option I: Handling of customer complaints since last visit. This option is correct because ISO 17021-1:2015 clause 9.6.2.2 requires the certification body to review the client's handling of customer complaints related to the certified activities since the last audit.
The following options are not correct:
*Option D: Complete a full document review of the quality management system. This option is not correct because ISO 17021-1:2015 clause 9.6.2.2 does not require the certification body to complete a full document review of the quality management system during surveillance audits. A full document review is only required during the initial certification audit or when there are significant changes to the quality management system or the certification requirements.
*Option E: Failing to meet financial responsibilities. This option is not correct because ISO 17021-1:2015 clause 9.6.2.2 does not require the certification body to audit the client's financial responsibilities during surveillance audits. The certification body may have contractual arrangements with the client regarding the payment of fees, but this is not part of the surveillance audit process.
*Option G: Review the calibration status of the instrumentation. This option is not correct because ISO
17021-1:2015 clause 9.6.2.2 does not require the certification body to review the calibration status of the instrumentation during surveillance audits. The certification body may audit the client's monitoring and measuring resources as part of the quality management system requirements, but this is not a specific activity required by ISO 17021-1.
*Option J: Conduct a minimum number of annual surveillance audits during the certification period. This option is not correct because ISO 17021-1:2015 clause 9.6.2.2 does not require the certification body to conduct a minimum number of annual surveillance audits during the certification period. The certification body may determine the frequency and duration of surveillance audits based on the risk and performance of the client, but this is not a specific activity required by ISO 17021-1.
References:
*ISO 17021-1:2015 Conformity assessment - Requirements for bodies providing audit and certification of management systems - Part 1: Requirements
*ISO 9001 Lead Auditor Course Material, Module 7: Audit Follow-up and Surveillance, Slide 8: Surveillance Audit
*ISO 9001 Lead Auditor Training Course - IRCA Certified, Section 7.2: Audit Follow-up and Surveillance
*Lead Auditor Exam Preparation Guide (EPG) Template - PECB, Section 3.2: Exam Content Outline, Subsection 3.2.1: Section 1 - Audit Fundamentals, Subsection 3.2.2: Section 2 - Audit Principles, Subsection
3.2.3: Section 3 - Audit Process, Subsection 3.2.4: Section 4 - Audit Competencies


NEW QUESTION # 12
Which two of the following are the key expected results of a quality management system that conforms to the requirements of ISO 9001:2015?

  • A. Decreased number of management system nonconformities
  • B. Consistently provide products that meet customers' requirements
  • C. Decreased number of nonconforming products in all stages of the manufacturing cycle
  • D. Decreased number of warranty claims
  • E. Increased profits
  • F. Enhanced customer satisfaction

Answer: B,F

Explanation:
The key expected results of a quality management system that conforms to the requirements of ISO 9001:2015 are stated in clause 0.1 of the standard, which says: "The adoption of a quality management system is a strategic decision for an organization that can help to improve its overall performance and provide a sound basis for sustainable development initiatives. The potential benefits to an organization of implementing a quality management system based on this International Standard are: a) the ability to consistently provide products and services that meet customer and applicable statutory and regulatory requirements; b) facilitating opportunities to enhance customer satisfaction; c) addressing risks and opportunities associated with its context and objectives; d) the ability to demonstrate conformity to specified quality management system requirements." Therefore, the two options that best match these benefits are A and E, as they directly relate to providing products and services that meet customer requirements and enhancing customer satisfaction. The other options are not explicitly mentioned as key expected results, although they may be possible outcomes of implementing a quality management system. References: ISO 9001:2015 - Quality management systems - Requirements, Key Elements of an ISO 9001:2015 Quality Management System, What is ISO 9001 2015 as a Quality Management Systems?


NEW QUESTION # 13
You work for an organisation, 'A', which provides packaged food to the public. You are asked to lead a team (you as the leader and two other auditors) to audit a supplier, 'B', which provides packaging materials to your organisation. It is 4 p.m. and the audit is close to an end; you are having an internal meeting with the team to decide what will be presented to the auditee during the Closing meeting.
The Closing meeting was scheduled
for 5 p.m.
You, as audit team leader, audited top management, the laboratory, and the storage of raw materials.
Auditor 1 audited the two manufacturing lines and dispatch areas.
You to Auditor 1: "What findings would you report?"
Auditor 1: "When reviewing the Dispatch records, I noticed that during the morning two different trucks (Number 011 and 025) delivered the same batch number of the product (Batch 33555). Truck 011 left the plant at 9.15 am and Truck 025 left the plant at
11.30 am. Procedure P-02 Rev.3 says
that trucks should carry a complete batch. The batch number, once on the truck, is captured using a QR device." You: "OK, what do you think?" Auditor 2: "I think that this is a nonconformity." You: "OK. How would you describe the evidence on which the nonconformity will be based"?
Identify which one of the following statements best describes the identified nonconformity.

  • A. Dispatch personnel are not fully aware of the need to conform to written procedures.
  • B. A product delivered to the client was not identified as required in P-02 Rev 3.
  • C. The batch 33555 was delivered split in two different trucks (011 and 025).
  • D. Dispatch personnel do not always carry out its activities in conformance with Procedure P-02 rev 3.

Answer: C

Explanation:
According to the definition in ISO 9000, a nonconformity is "non-fulfillment of a requirement". There are three parts to a well-documented nonconformity: the audit evidence to support auditor findings; a record of the requirement against which the nonconformity is detected; and the statement of nonconformity1. In this case, the audit evidence is the dispatch records that show the same batch number of the product being delivered by two different trucks at different times. The requirement is the procedure P-02 Rev.3 that says that trucks should carry a complete batch. The statement of nonconformity is that the batch 33555 was delivered split in two different trucks (011 and 025), which does not conform to the procedure. Therefore, option C best describes the identified nonconformity, as it includes all three parts of a well-documented nonconformity.
Option A is not correct, as it does not state the audit evidence or the requirement. Option B is not correct, as it does not specify the audit evidence or the statement of nonconformity. Option D is not correct, as it does not match the audit evidence or the requirement. References: 1: ISO 9001 Auditing Practices Group Guidance on Nonconformity - Documenting.


NEW QUESTION # 14
You are conducting a third-party Stage 1 audit at ABC Ltd, a single-site organisation that manufactures wooden furniture. You interview the Technical Director to learn more about the organisation. The Technical Director explains that they have had a successful year and that obtaining ISO 9001 certification will support the further growth of the business. You ask for an overview of the organisation's structure and its interrelationships with external interested parties.
The Technical Director shows you a document detailing all business processes and interrelationships. You notice in this document that another organisation called Teak Ltd manufactures wooden furniture on behalf of ABC Ltd. The Technical Director confirms this capability has been accounted for in the scope of the quality management system. You learn that the furniture manufactured by Teak Ltd has accounted for 40% of the sales revenue over the previous 12 months.
Which two of the following options best describe how you would plan the audit of the interrelationship with Teak Ltd during the Stage 2 audit at ABC Ltd?

  • A. Verify the controls concerning customer property implemented by Teak Ltd
  • B. Verify how ABC Ltd evaluates the performance of Teak Ltd
  • C. Verify the quality management system at Teak Ltd by conducting an audit at their site
  • D. Verify Teak Ltd supply arrangements as described in the ABC Ltd quality management system
  • E. Verify if Teak Ltd are certified to ISO 9001
  • F. Verify whether the design processes of Teak Ltd comply with ISO 9001

Answer: B,D

Explanation:
According to ISO 9001:2015, clause 8.4, an organization is required to control the processes, products and services provided by external providers, including those that affect the quality of the organization's own products and services. This includes determining the controls to be applied to the external provision of processes, products and services, as well as the information to be communicated to the external providers. The organization is also required to monitor, measure, and evaluate the performance of the external providers and retain documented information of these activities.
Therefore, in the scenario given, ABC Ltd is responsible for controlling the processes, products and services provided by Teak Ltd, as they affect the quality of ABC Ltd's own products and services. This means that ABC Ltd should have established criteria and methods for evaluating the performance of Teak Ltd, as well as documented information of the results of such evaluation. ABC Ltd should also have defined the supply arrangements with Teak Ltd, including the specifications, requirements, and verification activities related to the products and services provided by Teak Ltd.
Hence, the best options to describe how to plan the audit of the interrelationship with Teak Ltd during the Stage 2 audit at ABC Ltd are A and D, as they are aligned with the requirements of ISO 9001:2015, clause 8.4.
The other options are either irrelevant or beyond the scope of the audit, as they do not pertain to the control of external provision by ABC Ltd.
References:
ISO 9001:2015(en), Quality management systems - Requirements, clause 8.4 ISO 19011:2018(en), Guidelines for auditing management systems, clause 6.3.1 and 6.4.2 ISO 9001 Lead Auditor Training Course | IRCA Certified | BSI, section "Learning objectives" ISO 9001 Lead Auditor Course Material | 3FOLD Education Centre, module 5 and 6


NEW QUESTION # 15
You work as an external quality consultant for an organisation, 'A', which provides packaged food to the public. You are asked to lead a team (you as the leader and two other auditors) to audit a supplier, 'B', to ISO
9001 which provides packaging materials to your organisation. It is 4 pm and the audit is close to an end; you are having an internal meeting with the team to decide what will be presented to the auditee during the Closing meeting. The Closing meeting was scheduled at 5 pm.
You, as Audit Team Leader, audited top management. You explain to the audit team that you identified two nonconformities:
a. There is no documented information on Top Management Reviews, as required in clause 9.3 of ISO
9001:2015.
b. There is no evidence of Top Management Commitment as required in clause 5.1 of ISO 9001:2015. (e.g., not ensuring the availability of resources to operate the QMS, not ensuring the establishment of objectives, no promotion of improvement, no promotion of the process approach).
All agreed to present these two nonconformities. They went to meet the Top Management of 'B' and noticed that the General Manager and three other managers (Production, Human Resources, and Sales) were present in the meeting room.
Considering the seriousness of the two nonconformities to Top Management, as audit team leader, from the following select the best option:

  • A. Present the nonconformities to the managers, inform them that the report will be sent within 10 days, close the meeting and leave the site.
  • B. Ask the General Manager to have a private conversation in which you present the nonconformities only to him because of their sensitive nature.
  • C. Present the nonconformities to the whole group and analyse with them how to overcome this situation.
  • D. Present the nonconformities to the whole group and inform that you will recommend your company to remove them from the approved suppliers list.

Answer: C

Explanation:
According to the guidance on conducting the audit closing meeting1, the audit team leader should provide a summary of the audit findings and conclusions, invite discussions, and agree on timelines for any corrective actions. The audit team leader should also be respectful, constructive, and objective when presenting the nonconformities, and avoid any personal or emotional comments. The audit team leader should also consider the impact of the disruptive event (such as the Covid-19 pandemic) on the auditee's context, interested parties, and risks2, and acknowledge any good practices or improvements observed during the audit. Therefore, option D is the best option, as it follows the best practices for the closing meeting and allows the auditee to understand the nonconformities and their implications, and to participate in the analysis and resolution of the issues. Option A is not correct, as it is not respectful, constructive, or objective, and it does not invite any discussion or feedback from the auditee. It also assumes that the audit team leader has the authority to recommend the removal of the supplier from the approved list, which may not be the case. Option B is not correct, as it does not provide enough information or explanation to the auditee, and it does not allow any discussion or feedback from the auditee. It also does not follow the best practices for the closing meeting, such as providing a summary of the audit, acknowledging any good practices, and agreeing on timelines for corrective actions. Option C is not correct, as it does not involve the other managers who are responsible for the functions or processes that were audited, and who may have valuable input or information to share. It also does not follow the best practices for the closing meeting, such as providing a summary of the audit, inviting discussions, and agreeing on timelines for corrective actions. References: 1: Conducting the Audit Closing Meeting: Sharing the Results2: Auditing ISO 9001:2015 in the Context of a Disruptive Event.


NEW QUESTION # 16
Select the word that best completes the sentence:

Answer:

Explanation:

Explanation:

According to the ISO - Management system standards page, the key benefits of an effective management system include improved operational effectiveness and efficiency, improved risk management and protection of people and the environment, and enhanced drive for innovation. The Integrated Use of Management System Standards (IUMSS) handbook also states that the purpose and objectives of management system standards are to help organizations improve their performance by specifying repeatable steps that organizations consciously implement to achieve their goals and objectives.
Therefore, the complete sentence is:
"The purpose of a management system standard is to improve the performance of an organisation."


NEW QUESTION # 17
An internal auditor of a manufacturer of polystyrene packaging products for the electronics industry raised a nonconformity against section 10.3 of ISO 9001 in Report IA202. The nonconformity (NC 3) stated:
"The reject rate of the finished product of 9.7% needs improvement as it doesn't meet the stated objective of top management of 5%." As the third-party auditor reviewing the internal audit process, you come across the nonconformity. For corrective action, the Quality Manager conducted an investigation into the reject rates. He reported that the collection baskets for products ejecting from the moulding machines were not large enough. About 6% of products fell onto the wet and dirty factory floor. Management stated that replacing the baskets was too costly and ordered the Maintenance Manager to ensure that the floor was kept clean and dry to prevent rejects. The auditor later checked the factory floor, which was wet and dirty in places.
From the following nonconformities, select three that the auditor could raise to ISO 9001.

  • A. 10.2.1 - Conduct of an investigation was not sufficient to understand the cause of the nonconformity.
  • B. 7.1.1 - The organisation failed to provide the required resources to prevent nonconforming products.
  • C. 7.3 - Staff were not aware that products were falling onto the factory floor.
  • D. 7.1.4 - The factory environment is not suitably maintained to prevent dirty products.
  • E. 10.3 - The organisation did not continuously improve. Reject rates were unchanged.
  • F. 8.6 - Dirty products were released to the customer.
  • G. 8.5.1 - Production operations were not properly controlled to avoid reject products.
  • H. 9.2.2 - Report IA202 contained a poorly worded nonconformity (NC 3).

Answer: B,D,E

Explanation:
The auditor could raise the following nonconformities to ISO 9001 based on the scenario:
*Option A: 10.3 - The organisation did not continuously improve. Reject rates were unchanged. This option is correct because ISO 9001:2015 clause 10.3 requires the organization to improve the suitability, adequacy and effectiveness of the quality management system. The organization did not demonstrate any improvement in reducing the reject rate of the finished product, which was a stated objective of top management. The corrective action taken by the organization was not effective in addressing the root cause of the problem and preventing its recurrence.
*Option B: 7.1.4 - The factory environment is not suitably maintained to prevent dirty products. This option is correct because ISO 9001:2015 clause 7.1.4 requires the organization to determine, provide and maintain the environment necessary for the operation of its processes and to achieve conformity of products and services.
The organization did not ensure that the factory floor was clean and dry, which affected the quality of the products and increased the risk of nonconformity.
*Option C: 7.1.1 - The organization failed to provide the required resources to prevent nonconforming products. This option is correct because ISO 9001:2015 clause 7.1.1 requires the organization to determine and provide the resources needed for the establishment, implementation, maintenance and continual improvement of the quality management system. The organization did not provide adequate collection baskets for the products ejecting from the moulding machines, which resulted in products falling onto the factory floor and becoming nonconforming.
The following options are not correct:
*Option D: 9.2.2 - Report IA202 contained a poorly worded nonconformity (NC 3). This option is not correct because ISO 9001:2015 clause 9.2.2 does not specify the requirements for the wording of nonconformities in internal audit reports. The nonconformity (NC 3) stated by the internal auditor was clear and relevant to the audit criteria and audit evidence. The issue is not with the report, but with the corrective action taken by the organization.
*Option E: 8.6 - Dirty products were released to the customer. This option is not correct because ISO
9001:2015 clause 8.6 requires the organization to implement planned arrangements, at appropriate stages, to verify that the product and service requirements have been met. The scenario does not indicate that the dirty products were released to the customer, but that they were recalled and repaired then returned to the customers. The issue is not with the release, but with the production process and the environment.
*Option F: 7.3 - Staff were not aware that products were falling onto the factory floor. This option is not correct because ISO 9001:2015 clause 7.3 requires the organization to ensure that the persons doing work under its control are aware of the quality policy, relevant quality objectives, their contribution to the effectiveness of the quality management system, and the implications of not conforming with the quality management system requirements. The scenario does not indicate that the staff were not aware of these aspects, but that the management did not provide adequate resources and environment for the staff to perform their work. The issue is not with the awareness, but with the management responsibility and resource provision.
*Option G: 10.2.1 - Conduct of an investigation was not sufficient to understand the cause of the nonconformity. This option is not correct because ISO 9001:2015 clause 10.2.1 requires the organization to react to the nonconformity and, as applicable, take action to control and correct it and deal with the consequences. The scenario indicates that the Quality Manager conducted an investigation into the reject rates and identified the cause of the nonconformity. The issue is not with the investigation, but with the corrective action taken by the management.
*Option H: 8.5.1 - Production operations were not properly controlled to avoid reject products. This option is not correct because ISO 9001:2015 clause 8.5.1 requires the organization to implement production and service provision under controlled conditions. The scenario indicates that the production operations were controlled by the moulding machines, which ejected the products into the collection baskets. The issue is not with the production operations, but with the size of the collection baskets and the condition of the factory floor.
References:
*ISO 9001:2015 Quality management systems - Requirements
*ISO 9001 Lead Auditor Course Material, Module 6: Reporting Audit Findings, Slide 14: Writing Nonconformity Statements
*ISO 9001 Lead Auditor Training Course - IRCA Certified, Section 6.2: Reporting Audit Findings
*Lead Auditor Exam Preparation Guide (EPG) Template - PECB, Section 3.2: Exam Content Outline, Subsection 3.2.1: Section 1 - Audit Fundamentals, Subsection 3.2.2: Section 2 - Audit Principles, Subsection
3.2.3: Section 3 - Audit Process, Subsection 3.2.4: Section 4 - Audit Competencies


NEW QUESTION # 18
Which two of the following are the key expected results of a quality management system that conforms to the requirements of ISO 9001:2015?

  • A. Decreased number of management system nonconformities
  • B. Consistently provide products that meet customers' requirements
  • C. Decreased number of nonconforming products in all stages of the manufacturing cycle
  • D. Decreased number of warranty claims
  • E. Increased profits
  • F. Enhanced customer satisfaction

Answer: B,F

Explanation:
According to the ISO 9001:2015 document, the key expected results of a quality management system that conforms to the requirements of ISO 9001:2015 are:
*the ability to consistently provide products and services that meet customer and applicable statutory and regulatory requirements;
*the enhancement of customer satisfaction.
These results are derived from the quality management principles of customer focus and process approach, which are the basis of the ISO 9000 family of standards1. Customer focus means understanding and meeting customer needs and expectations, as well as exceeding them when possible1. Process approach means managing activities as interrelated processes that function as a coherent system, which leads to consistent and predictable results1.
Therefore, the correct answer is C and F.
References: 2: ISO 9001:2015 - Quality management systems - Requirements 1: ISO - Quality management principles


NEW QUESTION # 19
In the context of a management system audit, identify the sequence of a typical process for collecting and verifying information. The first one has been done for you.
To complete the sequence click on the blank section you want to complete so it is highlighted in red and then click on the applicable text from the options below. Alternatively, drag and drop the options to the appropriate blank section.

Answer:

Explanation:

Explanation:
Identifying the source of information
Sampling available data
Gathering audit evidence
Verifying objective evidence
Evaluating evidence against the audit criteria
Making audit conclusions
Evaluating against the audit criteria
According to ISO 19011:2018, clause 6.4, the process of collecting and verifying information during an audit involves the following steps1:
Identifying the source of information: The audit team should identify the sources of information that are relevant to the audit objectives, scope and criteria. These sources may include documents, records, personnel, processes, activities, facilities, equipment, etc. The audit team should also determine the methods and tools for accessing and collecting the information, such as interviews, observations, document review, sampling, etc.
Sampling available data: The audit team should select a representative sample of the available data to verify the conformity and effectiveness of the management system. The sample size and selection method should be based on the audit objectives, scope and criteria, as well as the level of confidence and risk. The audit team should also consider the validity, reliability, relevance and sufficiency of the data.
Gathering audit evidence: The audit team should use the methods and tools identified in the previous step to collect audit evidence, which is the records, statements of fact or other information that are relevant to the audit criteria and verifiable. The audit team should record the audit evidence in a clear, concise and objective manner, using notes, checklists, photographs, audio or video recordings, etc.
Verifying objective evidence: The audit team should verify the accuracy, completeness and authenticity of the audit evidence collected. This may involve cross-checking different sources of information, confirming the identity and authority of the persons providing the information, examining the original documents or records, etc. The audit team should also identify any discrepancies, inconsistencies or gaps in the audit evidence.
Evaluating evidence against the audit criteria: The audit team should compare the audit evidence with the audit criteria to determine the extent of conformity and nonconformity. The audit team should also identify any opportunities for improvement, best practices, positive aspects or potential risks. The audit team should use professional judgement and apply the principles of auditing when evaluating the audit evidence.
Making audit conclusions: The audit team should consolidate the audit findings and evaluate the overall performance and effectiveness of the management system. The audit team should also consider the audit objectives, scope and criteria, as well as the context and expectations of the auditee and other interested parties. The audit team should provide a clear, concise and objective statement of the audit conclusions, which may include the degree of conformity, the achievement of the intended outcomes, the need for corrective actions, the suitability for certification, etc.
Evaluating against the audit criteria: The audit team should review the audit conclusions and ensure that they are consistent with the audit criteria and supported by sufficient and appropriate audit evidence.
The audit team should also ensure that the audit conclusions are communicated to the auditee and other relevant parties in a timely and effective manner, using the agreed audit report format and distribution method.
References: ISO 19011:2018(en), Guidelines for auditing management systems


NEW QUESTION # 20
Which one of the following options best describes the purpose of a Stage 1 third-party audit?

  • A. To determine the auditees understanding of ISO 9001.
  • B. To learn about the organisation's procurement processes.
  • C. To introduce the audit team to the client.
  • D. To get to know the organisation's customers.

Answer: A

Explanation:
The purpose of a Stage 1 third-party audit is to determine an organization's readiness for their Stage 2 Certification Audit. During the Stage 1, the auditor will review the organization's management system documented information, evaluate the site-specific conditions, and have discussions with personnel. The objective is to assess the alignment of the organization's design with ISO 9001 requirements and to identify any areas of concern that could be classified as a nonconformance during the Stage 2 Audit. The auditor will also use the Stage 1 Audit to complete Stage 2 Audit planning, including a review of the allocation of resources and details for the next phase of the audit. Therefore, the option that best describes the purpose of a Stage 1 third-party audit is A, to determine the auditees understanding of ISO 9001. The other options are not correct, as they are not the main focus of a Stage 1 audit:
*B. To get to know the organization's customers: This is not the purpose of a Stage 1 audit, as the auditor is not interested in the specific details of the organization's customers, but rather in the organization's ability to meet customer and applicable statutory and regulatory requirements.
*C. To learn about the organization's procurement processes: This is not the purpose of a Stage 1 audit, as the auditor is not interested in the specific details of the organization's procurement processes, but rather in the organization's ability to control externally provided processes, products and services.
*D. To introduce the audit team to the client: This is not the purpose of a Stage 1 audit, as the auditor is not there to make introductions, but rather to conduct a preliminary examination of the organization's compliance with ISO 9001 standards.
References: What is the difference between Stage 1 and Stage 2 Audits? - ISO Update, The ISO 9001 Audit Process Explained | ISO Explained, What is an ISO Stage 2 Audit? - RiskOptics - Reciprocity


NEW QUESTION # 21
Select six tasks you would expect to be completed at the audit team meeting of a third-party audit team leader and his audit team in preparation for a Closing meeting for a four-day initial certification audit.

  • A. Final audit team meeting to agree findings and categories including clarification of any uncertainties.
  • B. Audit team leader informs the individual(s) managing the audit programme that the closing meeting is ready to be held.
  • C. Audit team leader completes final report, including individual findings and certification recommendation.
  • D. Agree the roles of each audit team member for the closing meeting.
  • E. Write the audit finding report out when detected and obtain signature of the auditee.
  • F. Audit team review any points raised by the auditee nominated representative.
  • G. Re-audit corrective actions taken to correct findings found during the audit.
  • H. Audit team agree final audit outcome recommendation.
  • I. Audit team complete final version of their individual findings.
  • J. Hold daily audit team meeting to review any timetable issues and potential findings and their impact on the audit for other team members.

Answer: A,D,F,G,H,I

Explanation:
The tasks that are expected to be completed at the audit team meeting of a third-party audit team leader and his audit team in preparation for a Closing meeting for a four-day initial certification audit are:
*Option C: Final audit team meeting to agree findings and categories including clarification of any uncertainties. This option is correct because the audit team meeting is an opportunity for the audit team leader and the audit team members to review and consolidate the audit findings, to ensure that they are clear, accurate, objective, and supported by sufficient audit evidence. The audit team should also agree on the categories of the findings, such as nonconformity, observation, or opportunity for improvement, and resolve any uncertainties or disagreements among the audit team members.
*Option D: Agree the roles of each audit team member for the closing meeting. This option is correct because the audit team meeting is an opportunity for the audit team leader to assign the roles and responsibilities of each audit team member for the closing meeting, such as presenting the audit findings, answering questions, or taking notes. The audit team leader should also ensure that the audit team members are prepared and confident to perform their roles and to communicate effectively with the auditee.
*Option E: Audit team review any points raised by the auditee nominated representative. This option is correct because the audit team meeting is an opportunity for the audit team to review any points raised by the auditee nominated representative during the audit, such as requests for clarification, feedback, or complaints. The audit team should consider the validity and relevance of the points raised and decide how to address them in the closing meeting or in the audit report.
*Option F: Audit team agree final audit outcome recommendation. This option is correct because the audit team meeting is an opportunity for the audit team to agree on the final audit outcome recommendation, based on the audit findings and the audit criteria. The audit team should also consider the implications and consequences of the audit outcome recommendation for the auditee and the certification body, and ensure that the recommendation is consistent and justified.
*Option H: Audit team complete final version of their individual findings. This option is correct because the audit team meeting is an opportunity for the audit team to complete the final version of their individual findings, based on the agreement and feedback from the audit team meeting. The audit team should ensure that their individual findings are written in a clear, concise, and factual manner, and that they include the audit criteria, the audit evidence, and the audit conclusion. The audit team should also submit their individual findings to the audit team leader for review and approval.
*Option I: Re-audit corrective actions taken to correct findings found during the audit. This option is correct because the audit team meeting is an opportunity for the audit team to re-audit the corrective actions taken by the auditee to correct the findings found during the audit, if applicable and feasible. The audit team should verify the effectiveness and adequacy of the corrective actions and update the audit findings accordingly. The audit team should also document the results of the re-audit and communicate them to the auditee.
The following options are not correct:
*Option A: Audit team leader informs the individual(s) managing the audit programme that the closing meeting is ready to be held. This option is not correct because this task is not part of the audit team meeting, but part of the communication between the audit team leader and the individual(s) managing the audit programme. The audit team leader should inform the individual(s) managing the audit programme that the closing meeting is ready to be held after the audit team meeting, when the audit team has completed all the tasks and is ready to present the audit results to the auditee.
*Option B: Hold daily audit team meeting to review any timetable issues and potential findings and their impact on the audit for other team members. This option is not correct because this task is not part of the final audit team meeting, but part of the daily audit team meetings that are held during the audit. The daily audit team meetings are opportunities for the audit team to review the progress and performance of the audit, to identify and resolve any issues or problems, and to coordinate and adjust the audit plan and activities as needed.
*Option G: Audit team leader completes final report, including individual findings and certification recommendation. This option is not correct because this task is not part of the audit team meeting, but part of the audit reporting process. The audit team leader should complete the final report, including the individual findings and the certification recommendation, after the closing meeting, when the audit team has received and considered the feedback and comments from the auditee. The audit team leader should also ensure that the final report is reviewed and approved by the appropriate authorities before issuing it to the auditee and the certification body.
*Option J: Write the audit finding report out when detected and obtain signature of the auditee. This option is not correct because this task is not part of the audit team meeting, but part of the audit evidence collection and documentation process. The audit team should write the audit finding report out when detected and obtain the signature of the auditee during the audit, when the audit team has observed and verified the audit evidence and has communicated the audit finding to the auditee. The signature of the auditee does not indicate acceptance or agreement with the audit finding, but only acknowledgement of receipt.
References:
*ISO 19011:2018 Guidelines for auditing management systems, Clause 6.4.2: Conducting audit activities, Subclause i) and j)
*ISO 9001 Lead Auditor Course Material, Module 5: Conducting an Audit, Slide 19: Audit Team Meeting
*ISO 9001 Lead Auditor Training Course - IRCA Certified, Section 5.4: Audit Team Meeting
*Lead Auditor Exam Preparation Guide (EPG) Template - PECB, Section 3.2: Exam Content Outline, Subsection 3.2.1: Section 1 - Audit Fundamentals, Subsection 3.2.2: Section 2 - Audit Principles, Subsection
3.2.3: Section 3 - Audit Process, Subsection 3.2.4: Section 4 - Audit Competencies


NEW QUESTION # 22
Match each of the following statements into the table below to show whether they apply to first-party audits, second-party audits or third-party audits:

Answer:

Explanation:

Explanation:

Table
Statement
First-party audits
Second-party audits
Third-party audits
The audit scope is typically determined by the organisation being audited.
Yes
No
No
The outcome of the audit is typically certification to a recognised standard.
No
No
Yes
The audit scope is typically confined to service/product provision capability.
No
Yes
No
Here is a brief explanation of each statement:
The audit scope is typically determined by the organisation being audited: This statement applies to first-party audits, also known as internal audits, where the organisation audits its own processes and activities to ensure conformity and improvement1. The organisation can decide the scope of the audit based on its own needs and objectives2. This statement does not apply to second-party audits, where the customer audits the supplier, or third-party audits, where an independent body audits the organisation. In these cases, the audit scope is determined by the customer or the certification body, respectively34.
The outcome of the audit is typically certification to a recognised standard: This statement applies to third-party audits, where an independent body audits the organisation to verify that it meets the requirements of a specific standard, such as ISO 9001, and issues a certificate of conformity if the audit is successful34. This statement does not apply to first-party audits or second-party audits, where the outcome of the audit is not certification, but rather self-improvement or supplier qualification13.
The audit scope is typically confined to service/product provision capability: This statement applies to second-party audits, where the customer audits the supplier to ensure that they are meeting the requirements specified in the contract, such as service or product quality, delivery, or performance34. The audit scope is usually focused on the specific aspects of the service or product that are of interest to the customer3. This statement does not apply to first-party audits or third-party audits, where the audit scope is broader and covers the entire quality management system or the relevant clauses of the standard14.


NEW QUESTION # 23
You have been nominated audit team leader of a third-party audit. Which of the following could be the two most relevant objectives of this audit?

  • A. Evaluate the effectiveness of the management system
  • B. Identify the need of resources
  • C. Evaluate the satisfaction interested parties
  • D. Evaluate the capability of the management system to establish and achieve objectives
  • E. Evaluate the benefits obtained since the implementation of the management system
  • F. Identify opportunities for improvement

Answer: A,D


NEW QUESTION # 24
Which of the following two documents does an auditor need to prepare and complete prior to the on-site audit?

  • A. Procedures
  • B. Audit Plan
  • C. Audit Report
  • D. Findings
  • E. Risk Matrices
  • F. Checklist / Prompts

Answer: B,F

Explanation:
According to ISO 19011:2018, clause 6.3, the audit plan is a document that provides the basis for agreement regarding the conduct of the audit. The audit plan should include the information listed in my previous response, such as the audit objectives, scope, criteria, schedule, team, methods, report, etc. The audit plan should be prepared and completed prior to the on-site audit, and should be communicated to the audit team and the auditee1.
According to ISO 19011:2018, clause 6.4.3, the checklist / prompts are documents that list the questions or topics that need to be covered during an audit. The checklist / prompts can help the auditor to collect and verify information relevant to the audit criteria, and to ensure the consistency and completeness of the audit.
The checklist / prompts should be prepared and completed prior to the on-site audit, and should be based on the audit plan and the audit scope and objectives1.
Therefore, the two documents that an auditor needs to prepare and complete prior to the on-site audit are B and D, as they are essential for planning and conducting the audit. The other options are not correct, as they are either prepared or completed after the on-site audit, or not required by the standard:
*A. Audit Report: The audit report is a document that provides a complete, accurate, concise, and clear record of the audit. The audit report should include the information listed in my previous response, such as the audit objectives, scope, criteria, findings, conclusions, etc. The audit report should be prepared and completed after the on-site audit, and should be distributed to the audit client and the auditee1.
*C. Procedures: Procedures are documents that specify the way activities are to be performed. Procedures may be part of the audit criteria, if they are part of the organization's management system, or part of the audit programme, if they are part of the certification body's or registrar's requirements. Procedures are not prepared or completed by the auditor prior to the on-site audit, but rather reviewed or followed by the auditor during the audit1.
*E. Risk Matrices: Risk matrices are tools that help to assess and prioritize the risks and opportunities associated with the audit programme or the audit. Risk matrices may be part of the audit programme management, if they are used to determine and evaluate the audit programme risks and opportunities, or part of the audit preparation, if they are used to determine and evaluate the audit risks and opportunities. Risk matrices are not prepared or completed by the auditor prior to the on-site audit, but rather used or updated by the auditor during the audit programme management or the audit preparation1.
*F. Findings: Findings are the results of the evaluation of the collected audit evidence against the audit criteria.
Findings can indicate either conformity or nonconformity, as well as positive aspects or opportunities for improvement. Findings are not prepared or completed by the auditor prior to the on-site audit, but rather generated and recorded by the auditor during the audit activities1.
References: ISO 19011:2018(en), Guidelines for auditing management systems


NEW QUESTION # 25
Select the term which best describes the quality management system process of modifying a non-conforming product to bring it within acceptance criteria.

  • A. Correction
  • B. Corrective action
  • C. Preventive action
  • D. Concession

Answer: A

Explanation:
According to the ISO 9000:2015 - Quality management systems - Fundamentals and vocabulary, correction is defined as "action to eliminate a detected nonconformity". A nonconformity is defined as "non-fulfilment of a requirement". Therefore, the process of modifying a non-conforming product to bring it within acceptance criteria is a correction, as it eliminates the non-fulfilment of the product specification. The other options are not correct, as they have different definitions and purposes:
*Concession: permission to release or use a nonconforming product, service or process
*Corrective action: action to eliminate the cause of a nonconformity and to prevent recurrence
*Preventive action: action to eliminate the cause of a potential nonconformity or other undesirable potential situation References: ISO 9000:2015 - Quality management systems - Fundamentals and vocabulary, ISO 9001 nonconforming product: How to understand dispositions - Advisera


NEW QUESTION # 26
You are carrying out an audit at a single-site organisation seeking certification to ISO 9001 for the first time.
The organization manufactures cosmetics for major retailers.
You are interviewing the Manufacturing Manager (MM).
You: "I would like to begin by looking at the cleaning controls."
MM: "We record the cleaning of the equipment at the end of every batch. This document details the minimum cleaning frequency and the procedures to follow for all areas and each item of equipment. The person who carries out the cleaning puts their initial on the document and records the time and date alongside." Narrative: You sample production records over 3-days and note down evidence of nonconformity as per the table below.

Answer:

Explanation:

Explanation:
Nonconformity report
ISO 9001 Clause Number: 8.5.4 Nature of problem: Cleaning and sanitising records are not available for every batch. ISO 9001 requirement that has not been fulfilled: ISO 9001 - "The organization shall implement planned arrangements, at appropriate stages, to verify that the product requirements have been met." Evidence: 40 cleaning records are available for 63 batches.


NEW QUESTION # 27
During a second-party audit of a dairy farm (by a potential customer) complying with ISO 9001:2015, the auditor verifies that there is large variability in the daily production of the milking yard. The current agreement with their only customer is to provide 2,000 litres per day. However, in the last two years, they have noticed an increasing variability in daily production.
If they produce less than 2,000 litres, they are penalised with a fine of 1.5 pesos for every litre that they do not provide. If they produce more than 2,000 litres, they use the extra milk to feed the pigs.
This process has been in operation for decades. The dairy farm was founded by the grandfather of the current owners, who did not want to alter the established practices.
The auditor raises a nonconformity on the basis that the process is not under control (Clause 8.1).
If you had been the auditor, which one of the following actions would you have accepted?

  • A. Retain the current contract and try to sell the occasional surplus milk to a second customer.
  • B. Modify the contract with the current customer to provide them with only 1,500 litres of milk per day and make an agreement with a second customer.
  • C. Apply the existing process of addressing the risks and opportunities of milk production.
  • D. Analyse the daily dispatch of milk for 7 days to determine its variability.

Answer: C

Explanation:
The action that the auditor would have accepted is:
*Option B: Apply the existing process of addressing the risks and opportunities of milk production. This option is correct because ISO 9001:2015 clause 8.1 requires the organization to plan, implement and control the processes needed to meet the requirements for the provision of products and services, and to implement actions determined in clause 6.1, which refers to the actions to address risks and opportunities. The organization should apply the existing process of addressing the risks and opportunities of milk production, which may include identifying the sources of variability, assessing the potential impacts and consequences, determining and implementing appropriate actions to reduce or eliminate the variability, monitoring and measuring the effectiveness of the actions, and reviewing and updating the actions as necessary.
The following options are not correct:
*Option A: Modify the contract with the current customer to provide them with only 1,500 litres of milk per day and make an agreement with a second customer. This option is not correct because it does not address the root cause of the variability in the daily production of the milking yard, which may affect the quality and consistency of the products and services provided by the organization. It also does not demonstrate the organization's commitment to meet the customer and applicable statutory and regulatory requirements, as required by ISO 9001:2015 clause 8.2.2.
*Option C: Retain the current contract and try to sell the occasional surplus milk to a second customer. This option is not correct because it does not address the root cause of the variability in the daily production of the milking yard, which may affect the quality and consistency of the products and services provided by the organization. It also does not demonstrate the organization's commitment to meet the customer and applicable statutory and regulatory requirements, as required by ISO 9001:2015 clause 8.2.2.
*Option D: Analyse the daily dispatch of milk for 7 days to determine its variability. This option is not correct because it does not address the root cause of the variability in the daily production of the milking yard, which may affect the quality and consistency of the products and services provided by the organization. It also does not demonstrate the organization's commitment to implement actions to address risks and opportunities, as required by ISO 9001:2015 clause 8.1.
References:
*ISO 9001:2015 Quality management systems - Requirements, Clause 8: Operation, Subclause 8.1:
Operational planning and control, Subclause 8.2: Requirements for products and services
*ISO 9001 Lead Auditor Course Material, Module 4: ISO 9001:2015 Requirements, Slide 23: Clause 8 - Operation
*ISO 9001 Lead Auditor Training Course - IRCA Certified, Section 4.2: ISO 9001:2015 Requirements, Subsection 4.2.8: Clause 8 - Operation
*Lead Auditor Exam Preparation Guide (EPG) Template - PECB, Section 3.2: Exam Content Outline, Subsection 3.2.1: Section 1 - Audit Fundamentals, Subsection 3.2.2: Section 2 - Audit Principles, Subsection
3.2.3: Section 3 - Audit Process, Subsection 3.2.4: Section 4 - Audit Competencies


NEW QUESTION # 28
You are conducting a third-party audit to ISO 9001 and the next item on your audit plan is 'internal auditing'.
When reviewing a sample of audit records up to 5 years previously, you find that many contain non-conformance reports and no actions have been taken. You interview the Quality Manager.
You: "I have noted that many of the older files contain non-conformances that have not had any corrective action taken." Quality Manager: "Because the business is always changing, the departmental managers tell me that the non-conformances are no longer applicable. I made a decision that any non-conformance over 3 years old is automatically closed" You: "Do you obtain any confirmation beforehand from the appropriate departments that the non-conformances are no longer applicable." Quality Manager: " No, because they are so old I consider that they are no longer appropriate. Please remember that we take a risk-based approach which means we audit where and when it is considered important to do so.
Select one course of action you would now take from the options.

  • A. Raise a non-conformance report against clause 9.2.2.e of ISO 9001
  • B. Interview relevant Departmental managers to assess whether the older non-conformances are still valid.
  • C. Review all non-conformances reports related to clause 9.2 of ISO 9001
  • D. Interview Top management to determine whether they were aware of and agreed the actions of the Quality Manager

Answer: A

Explanation:
According to ISO 9001:2015, clause 9.2.2.e, the organization is required to retain documented information as evidence of the implementation of the audit programme and the audit results. This includes the records of the nonconformities identified during the internal audits and the corrective actions taken to address them. The organization is also required to verify the effectiveness of the corrective actions, as per clause 10.2.2.
Therefore, in the scenario given, the Quality Manager's decision to automatically close any nonconformance over 3 years old without obtaining any confirmation from the relevant departments or verifying the effectiveness of the corrective actions is a clear violation of the requirements of clause 9.2.2.e. This indicates a lack of control and follow-up of the internal audit process, as well as a potential risk of recurrence or occurrence of the nonconformities in other areas. This also undermines the credibility and value of the internal audit programme, as well as the risk-based approach claimed by the Quality Manager.
Hence, the best course of action to take is D, to raise a nonconformance report against clause 9.2.2.e of ISO
9001, and to communicate the audit findings to the relevant management. The other options are either insufficient or irrelevant to address the issue, as they do not directly relate to the noncompliance with clause
9.2.2.e.
References:
ISO 9001:2015(en), Quality management systems - Requirements, clause 9.2.2 and 10.2.2 ISO 19011:2018(en), Guidelines for auditing management systems, clause 6.4.4 and 6.7.2 ISO 9001 Lead Auditor Training Course | IRCA Certified | BSI, section "Learning objectives" ISO 9001 Lead Auditor Course Material | 3FOLD Education Centre, module 5 and 6


NEW QUESTION # 29
During a third-party audit of a pharmaceutical organisation (CD9000) site of seven COVID-19 testing laboratories in various terminals at a major international airport, you interview the CD 9000's General Manager (GM), who was accompanied by Jack, the legal compliance expert. Jack is acting as the guide in the absence of the Technical Manager due to him contracting COVID-19.
You: "What external and internal issues have been identified that could affect CD9000 and its quality management system?" GM: "Jack guided us on this. We identified issues like probable competition of another laboratory organisation in the airport, legal requirements on COVID-19 continuously changing, the shortage of competent laboratory analysists, the epidemic declining soon, shortage of chemicals for the analysis. It was quite a good experience." You: "Did you document these issues?" GM: "No. Jack said that ISO 9001 does not require us to document these issues." You: "How did you determine the risks associated with the issues and did you plan actions to address them?" GM: "I am not sure. The Technical Manager is responsible for this process. Jack may be able to answer this question in his absence." Select two options for how you would respond to the General Manager's suggestion:

  • A. I would delay the audit until the return of the technical manager
  • B. I would not accept the legal compliance expert answering the question.
  • C. I would ask for a different guide instead of the legal compliance expert.
  • D. I would ask the consultant to leave the meeting since he is not an employee of the organisation.
  • E. I would ask to audit the Technical Manager by phone.
  • F. I would look for evidence that the actions resulting from the risk assessment had been taken.

Answer: B,F

Explanation:
According to clause 4.1 of ISO 9001:2015, the organization should determine external and internal issues that are relevant to its purpose and its strategic direction and that affect its ability to achieve the intended results of its quality management system. The organization should monitor and review these issues and update them as necessary. Although the standard does not explicitly require documented information of these issues, it does require documented information as evidence of the implementation of the actions taken to address risks and opportunities, as per clause 6.1. The organization should also retain documented information as evidence of the results of the monitoring, measurement, analysis and evaluation of its QMS, as per clause 9.1. Therefore, the auditor should not accept the legal compliance expert answering the question, as he is not the person responsible for the process and may not have the necessary competence or knowledge of the QMS. The auditor should also look for evidence that the actions resulting from the risk assessment had been taken, as this is a requirement of the standard and a way to verify the effectiveness of the QMS. The other options are not appropriate courses of action for the auditor, because they do not address the audit objective or criteria, or they may compromise the audit integrity or impartiality. For example, option B may not be feasible or reliable, as the Technical Manager may not be available or able to provide the necessary evidence by phone. Option C may cause unnecessary delay and inconvenience for the audit process and the auditee. Option E may not solve the problem, as the guide is not the main source of evidence or information for the audit. Option F may be disrespectful or unprofessional, as the consultant may have a legitimate role or interest in the audit.
References: ISO 9001:2015, ISO 9001 Auditing Practices Group Guidance on Context of the Organization, ISO 9001 Auditing Practices Group Guidance on Audit Evidence


NEW QUESTION # 30
You are conducting an audit at a single-site organisation seeking certification to ISO 9001 for the first time.
The organisation manufactures cosmetics for major retailers and the name of the retailer supplied appears on the product packaging. Sales turnover has increased significantly over the past five years You are interviewing the new Product Development Manager. You note that a software application called SWIFT is used to help control the product development process.
You have gathered audit evidence as outlined in the table. Match the ISO 9001 clause 8.3 extracts to the audit evidence.

Answer:

Explanation:

Explanation:

The table below shows the possible matching of the ISO 9001 Clause 8.3 extract to the audit evidence.
Table
Audit evidence
ISO 9001 Clause 8.3 extract
Half of all new products launched in the past 12 months were late. The NPD Manager explains he has not got enough people on his team to cope with the demand for new products.
"8.3.2 e) ... internal ... resource needs for the design and development of products ..." The NPD Manager explains many changes are made to cosmetic formulations during product development owing to retailer feedback. Only when confirmed by the retailer is the agreed formulation documented on SWIFT.
"8.3.5 ... retain documented information ..."
The NPD Manager explains that the customer confirms their approval to proceed with a new formulation by email. These emails are kept on SWIFT.
"8.3.6 ... retain documented information ..."
The NPD Manager shows you evidence of consumer trials that are carried out for some new products prior to full-scale launch.
"8.3.4 d) ... conducted to ensure that the resulting products and services meet the requirements ..." The NPD Manager explains that an approved external laboratory is used to perform shelf-life stability trials on some formulations during product development.
"8.3.2 e) ... external ... resource needs for the design and development of products ..."


NEW QUESTION # 31
An audit team leader arrives at a printing company to carry out a Stage 2 audit for a certification body. At a meeting with the Quality Manager, she is told that they have won their biggest contract from a computer manufacturer to print and compile computer documentation packages. The Quality Manager wants the ISO
9001 certificate to cover the new contract.
During the audit, a team member found that some print jobs had been rejected by several clients over some months due to spelling errors in the print run. The Print Manager blames the new employees they had to take on because of a big contract.
The auditor finds that the responsibility for checking spelling errors is placed on the printer that sets up the print run.
In line with the policy of the certification body, the audit team raise improvement opportunities in the audit report. Which three of the following options would represent acceptable opportunities for improvement in the report?

  • A. A plan to determine why the errors occur and to prevent them.
  • B. An intensive training plan that involves all production personnel.
  • C. More process time needs to be allocated to the new employees.
  • D. Operational planning activities may benefit from a clearer risk-based approach.
  • E. The organisation needs to delay its certification to gain more experience of the QMS.
  • F. The responsibility for checking printing needs to be independent of the operators.
  • G. The recruitment process to include spelling tests to filter out unsuitable candidates.
  • H. A business consultant can be recommended for advice on improving operations.

Answer: A,D,F

Explanation:
According to the ISO 9001 Auditing Practices Group Guidance on Improvement Opportunities1, an improvement opportunity is a suggestion made by the auditor for the auditee to consider that, if implemented, may enhance the performance of the QMS. Improvement opportunities are not mandatory, but they should be based on objective evidence and aligned with the audit criteria and objectives. Improvement opportunities should also be realistic, feasible, and beneficial for the auditee. In this case, the evidence statements that represent acceptable improvement opportunities in the report are A, C, and E, because they address the potential causes and effects of the spelling errors in the print run, and propose possible actions that may improve the quality of the products and services, and the effectiveness of the QMS. These options are consistent with the requirements and principles of ISO 9001, such as clause 6.1 on actions to address risks and opportunities, clause 8.1 on operational planning and control, clause 8.5.1 on control of production and service provision, and clause 10.2 on nonconformity and corrective action. The other options are not appropriate improvement opportunities, because they are either irrelevant, unrealistic, or unhelpful for the auditee. For example, option B may contradict the audit objective and scope, option D may imply a lack of auditor competence or impartiality, option F may not address the root cause of the problem, option G may not be applicable or effective, and option H may not be feasible or justified. References: ISO 9001 Auditing Practices Group Guidance on Improvement Opportunities, ISO 9001:2015, ISO 9001 Auditing Practices Group Guidance on Audit Evidence


NEW QUESTION # 32
Select the words that best complete the sentence:

Answer:

Explanation:

Explanation:
According to the ISO 19011:2018 document, the audit plan should provide the basis for agreement regarding the conduct and scheduling of the audit activities. The amount of detail provided in the audit plan should reflect the scope and complexity of the audit, as well as the risk of not achieving the audit objectives1. The scope of the audit refers to the extent and boundaries of the audit, such as the audit criteria, the audit objectives, the organizational and functional units, and the processes to be audited1. The complexity of the audit refers to the degree of difficulty or intricacy of the audit, such as the number and diversity of the auditees, the audit criteria, the audit methods, and the audit team composition2. The risk of not achieving the audit objectives refers to the possibility that the audit may fail to provide reliable and sufficient audit evidence to support the audit conclusions and report1.
Therefore, the complete sentence is:
In the context of a third-party audit, the amount of detail provided in the audit plan should reflect the scope and complexity of the audit, as well as the risk of not achieving the audit objectives.
References: 1: ISO 19011:2018 - Guidelines for auditing management systems 2: Audit Complexity - an overview | ScienceDirect Topics


NEW QUESTION # 33
Match the process descriptions below to the process names:

Answer:

Explanation:

Explanation:
Match the process descriptions below to the process names:
The process by which the accuracy of test equipment is checked against a known standard. = Calibration The process by which a product or service is visually examined to determine conformity to requirements. = Evaluation The process by which data is examined in detail to reach a specific answer or answers. = Analysis The process by which a parameter of a product or service is examined to determine a specific value. = Measurement According to the ISO 9000:2015 - Quality management systems - Fundamentals and vocabulary, the definitions of the process names are as follows:
Calibration: operation that, under specified conditions, in a first step, establishes a relation between the quantity values with measurement uncertainties provided by measurement standards and corresponding indications with associated measurement uncertainties and, in a second step, uses this information to establish a relation for obtaining a measurement result from an indication.
Evaluation: determination of the suitability, adequacy or effectiveness of an object to achieve established objectives.
Analysis: detailed examination of the elements or structure of something.
Measurement: process to experimentally obtain one or more quantity values that can reasonably be attributed to a quantity.
Therefore, the process descriptions can be matched to the process names based on these definitions.
References:
ISO 9000:2015 - Quality management systems - Fundamentals and vocabulary


NEW QUESTION # 34
In a third-party audit to ISO 9001, select two options of when the organisation is required to act in response to reported findings.

  • A. A finding of conformity is reported.
  • B. A major non-conformity is raised.
  • C. A recommendation is given in the report.
  • D. A minor non-conformity is raised.
  • E. An opportunity for improvement is raised.
  • F. A finding of good practice is reported.

Answer: B,D

Explanation:
According to ISO 19011:2018, clause 6.6.2, a nonconformity is the non-fulfilment of a requirement. A nonconformity can be classified as either major or minor, depending on the nature and extent of the deviation from the audit criteria. A major nonconformity is a nonconformity that affects the ability or the integrity of the organization's management system to achieve the intended results. A minor nonconformity is a nonconformity that does not affect the ability or the integrity of the organization's management system to achieve the intended results, but is a deviation from the audit criteria1.
According to ISO/IEC 17021-1:2015, clause 9.4.9, the organization is required to analyze the cause and describe the specific correction and corrective actions taken, or planned to be taken, to eliminate detected nonconformities, within a defined time. The organization is also required to provide the certification body with records and evidence of the implementation and effectiveness of the correction and corrective actions taken.
The certification body will then verify the correction and corrective actions taken by the organization and decide on the certification status2.
Therefore, the two options of when the organization is required to act in response to reported findings are D and F, as they indicate the presence of nonconformities that need to be corrected and prevented from recurring.
The other options are not correct, as they do not require the organization to act in response to reported findings:
*A. A recommendation is given in the report: A recommendation is a suggestion for improvement that is not related to a nonconformity. A recommendation is not binding for the organization and does not affect the certification status. The organization may choose to accept or reject the recommendation, but it is not required to act on it.
*B. A finding of good practice is reported: A finding of good practice is a positive observation that indicates a strength or a best practice of the organization's management system. A finding of good practice is not related to a nonconformity and does not affect the certification status. The organization may choose to acknowledge or share the finding of good practice, but it is not required to act on it.
*C. An opportunity for improvement is raised: An opportunity for improvement is a potential area where the organization's management system can be enhanced or optimized. An opportunity for improvement is not related to a nonconformity and does not affect the certification status. The organization may choose to pursue or ignore the opportunity for improvement, but it is not required to act on it.
*E. A finding of conformity is reported: A finding of conformity is a confirmation that the organization's management system fulfils the audit criteria. A finding of conformity is not related to a nonconformity and does not affect the certification status. The organization may choose to celebrate or communicate the finding of conformity, but it is not required to act on it.
References: ISO 19011:2018(en), Guidelines for auditing management systems, ISO/IEC 17021-1:2015(en), Conformity assessment - Requirements for bodies providing audit and certification of management systems
- Part 1: Requirements


NEW QUESTION # 35
During a second-party audit, the auditor examines the records that are available for the external provider, ABC Forgings, to whom manufacturing has recently been outsourced.
There are standard external provider checklists for three competitors for the contract and there are inspection records from the trial manufacturing batches produced by ABC Forgings. There is no documented evidence of the criteria used to confirm the appointment of ABC Forgings, and no contract or terms and conditions.
Ongoing monitoring indicates that external provider performance is satisfactory, but no documented information has been retained.
Select two options for the evidence which demonstrates a nonconformity with clause 8.4 of ISO 9001.

  • A. The auditee trusted the external provider because of a long-standing relationship with them.
  • B. The external provider asked for the contract details to be verbal only.
  • C. The auditee required the outsourced products on an urgent basis before the completion of the paperwork.
  • D. There was no documentation which provided evidence of any monitoring of the external provider.
  • E. The auditee did not retain documentation on the selection and evaluation of the external provider.
  • F. There were no receipt inspection records of the incoming materials.

Answer: D,E

Explanation:
According to clause 8.4 of ISO 9001:2015, the organization should ensure that externally provided processes, products, and services conform to the specified requirements. To do so, the organization should:
*Establish the criteria for the selection, evaluation, and re-evaluation of external providers, based on their ability to provide processes, products, and services in accordance with the requirements. The criteria should be documented and applied consistently.
*Evaluate the potential external providers before selecting them, using the established criteria. The evaluation methods may include questionnaires, audits, references, samples, etc. The results of the evaluation should be documented and reviewed.
*Select the external providers that have demonstrated their competence and conformity to the requirements.
The selection should be based on the evaluation results and the organization's needs. The selection should be documented and approved.
*Communicate the requirements for the processes, products, and services to be provided by the external provider, including the verification and validation activities, the acceptance criteria, the documentation requirements, the changes control, etc. The communication methods may include purchase orders, contracts, agreements, etc. The communication should be clear, complete, and timely.
*Monitor the performance and conformity of the external provider, using the established criteria and methods.
The monitoring methods may include inspections, tests, audits, feedback, complaints, etc. The monitoring results should be documented and analyzed.
In this case, the evidence statements that demonstrate a nonconformity with clause 8.4 are A and C, because they show that the organization did not retain documented information of the selection and evaluation of the external provider, and the monitoring of the external provider's performance. These are requirements of the standard and essential for ensuring the quality of the externally provided processes, products, and services.
The other options are not directly related to clause 8.4, although they may indicate other nonconformities or weaknesses in the organization's QMS. For example, option B may relate to clause 7.1.3 on contingency planning, option D may relate to clause 8.2.3 on review of requirements, option E may relate to clause 8.6 on release of products and services, and option F may relate to clause 5.1.1 on leadership and commitment.
References: ISO 9001:2015, [ISO 9001 Auditing Practices Group Guidance on Scope], Mastering the Scope of ISO 9001 Quality Management Systems


NEW QUESTION # 36
......

Test Engine to Practice ISO-9001-Lead-Auditor Test Questions: https://www.pass4surequiz.com/ISO-9001-Lead-Auditor-exam-quiz.html

ISO-9001-Lead-Auditor Real Exam Questions Test Engine Dumps Training With 62 Questions: https://drive.google.com/open?id=1ZZ0HJH-bKXdANZkThWYxd8HUiH_Tfe_C